Ou como se encarou e encara o caminho-de-ferro em Portugal, comparando aqui e ali com outros países.
segunda-feira, 8 de fevereiro de 2016
Lleida — La Pobla de Segur
SPAIN: This spring Catalan regional operator FGC is due to place into service two Stadler Rail GTW 2/6 diesel multiple-units on the 1 668 mm gauge Lleida — La Pobla de Segur route.
Ordered at a cost of €9⋅4m and designated Class 331 by FGC, the new DMUs should enable the service frequency to be trebled to 10 trains in each direction on weekdays, while cutting the end-to-end journey time by 17 min.
http://www.railwaygazette.com/news/traction-rolling-stock/single-view/view/gtws-delivered-for-la-pobla-de-segur-route.html
Subscrever:
Enviar feedback (Atom)
Sem comentários:
Enviar um comentário